Skip to main content

Engineering Services

The Engineering Department provides a wide variety of services to the public and is available in person or by telephone.

Services and Functions of the Engineering Department:

Engineering FAQs

Development Services

  • $150 for boundary adjustment, single lot, and minor subdivisions
  • $250 for major subdivisions and commercial 
  • Plan Check Deposit 
  • Inspection Deposit
  • Plan Check Requirements 
  • Grading Plan Check
  • Static Pressure and General Information About the District

Information Maps:

  • Water System
  • Sewer System
  • Topography & Aerial
  • As-Built Plans

2021 Water and Sewer Fees

2021 Water_Sewer Cap Fees.pdf

Service Availability Letters: (Submittals must include a project plat map)

Engineering Forms: Click Here

District Domestic Water, Recycled Water & Sanitary Sewer Construction Standards Manual:

Standards Manual July 2016_Final.pdf

Capital Improvement Projects

  • Capital Project Updates and Schedules
  • Request for Proposals/Qualifications
  • Water and Sewer Master Plans Click Here

Advertised Construction Projects Out to Bid:

Lift Station #1 Replacement Phase 1 (Must be prequalified to bid):

Addendum 3-Lift Station #1 Replacement Phase 1Addendum 2-Lift Station #1 Replacement Phase 1.pdfAddendum 1 -Lift Station #1 Replacement Phase 1Addendum 1 / Attachment 1 - Drawings lift Station #1 Replacement Phase 1List of Qualified Contractors-LS-1.pdfVolume I - Lift Station #1 Replacement Phase 1Volume II - Lift Station #1 Replacement Phase 1Technical Specifications - Lift Station #1 Replacement Phase 1Final Drawings - Lift Station #1 Replacement Phase 1Appendix A - Geotech Reports

Appendix B - SDG&E Preliminary Service Plan. Currently not available - to be provided.

Appendix C - MMRPAppendix D - Caltrans Encroachment Permit Appendix E - SCADA Network Study - Thoroughbred LSAppendix F - Primus Scope.pdf

Appendix G - Project Easements. Currently not available - to be provided.

 

Advertised Requests for Proposals / Qualifications

There are no advertised RFPs or Pre-qualifications.

 

 RMWD Notice of Preparation of Programmatic Environmental Impact Report:

RMWD Notice of Preparation of Programmatic Environmental Impact Report:

RMWD Water & Sewer Facilities Plan PEIR Scoping Meeting Presentation June 16, 2021.

RMWD Water & Sewer Facilities Plan PEIR Scoping Meeting Presentation June 16, 2021.